Hey guys, that's not my diagram, it is found on the TP Tools & Equipment website.. Every aspect of that supply-pipe configuration helps to minimize moisture at the tool. In particular, the "R"/"E" riser at the top and the "T"/"R" riser to the tool on the down pipe are really helpful.