These 1-tons are different than the smaller ones.
After removeing the drive shaft remove the cotter
pin & pinion nut.Pull the yoke. There are 5-6
7/16 bolts around a flange. Remove these & the
flange. Than you can remove the seal from the
flange. There is a thick cork gasket that goes
under the flange. Tighten pinion nut securly &
tighten it farther to line up cotter pin holes.
There is no crush sleeve so preload is not
nessesary. cool


They say money can't buy happiness. It can buy old Chevy trucks though. Same thing.
1972 Chevy c10 Cheyenne Super
In the Gallery Forum