I finished my metal bed floor install on Ol Yeller. It took 15 days from finding a donor bed to completion. I really like the look and functionality. (Apologies to the wood bed purists). The donor bed floor came from a '77 dually. This is the first time I have cut metal (without explosives). Here is a short link:
Photobucket