My preference is to find a local guy with a large blasting rig, then show up on sunday with a case of beer and 50 bucks. With a huge blasting setup, he can have the frame done in about 5 minutes, versus 6-7 hours if you DIY. PLUS, then HE gets to breathe the sand.



She may not always start, and She may not always get me where Im going, but goddamnit, she will always stop.