Can you post the name of that trailer company?
I'm was just about to have stockton make me a set of their "20 series". I was quoted $155 each, and 3-4 weeks lead time.
Mine is a '52 3800 series 1 ton. I'm hoping for 215/85/16 on the front and 235/85/16 on the back.
Should 16x7 with 3.75" backspacing work out for me? I'd love to order one to check, but I'm not thrilled about 2 months to get everything squared away.