I also have been thru this saga so here’s my insight.
Key Considerations for Floor Replacement

Sheet Metal Layers:
  • Adding sheet metal over the existing floor can trap moisture, which may lead to accelerated rusting.
  • It's essential to address the root cause of rust rather than just covering it up.

Repair Experience:
  • Learning from others, like Kevin's truck floor repair, can provide useful insights.
  • Visual references and methods shared by others can help navigate the labor-intensive process.

DIY vs. Professional Help:
  • Many forum members have successfully completed similar projects, but it's crucial to evaluate your own skills and comfort level with metalwork.
  • If the project feels overwhelming, hiring a professional may be a prudent choice.

Structural Integrity:
  • The separation of the A pillar from the rocker is a significant concern, as it affects the structural integrity of the cab.
  • Addressing any issues in this area is critical for safety and stability.

Time Commitment
  • This project is substantial and requires a significant investment of time, money, and patience.
  • A typical timeframe for a DIYer can range from one to two years, depending on the time available to devote to the project.
  • Balancing shop time with family commitments is a common challenge, typically adding a significant amount of time that we don’t account for.

Last edited by Phak1; 06/11/2025 11:48 AM. Reason: Typo

Phil
Moderator, The Engine Shop, Interiors and Project Journals

1952 Chevrolet 3100, Three on the Tree, 4:11 torque tube
Updated to: ‘59 235 w/hydraulic lifters, 12v w/alternator, HEI, PCV and Power front Disc Brakes
Project Journals
Stovebolt Gallery Forum