Good idea, Jerry.

The ditch company is going to enclose the ditch water in pipe next summer. That's the only thing I can think of that could use pipe that big and there is a machine shop and fabricator that bought the machines from the Corp of Engineers who were finished with a dam project. They have some BIG machine tools.


1951 3800 1-ton
"Earning its keep from the get-go"
In the DITY Gallery
1962 261 (w/cam, Fenton headers, 2 carbs, MSD ign.), SM420 & Brown-Lipe 6231A 3spd aux. trans, stock axles & brakes. Owned since 1971.