Originally Posted by Apache1
If you don't mind Lugnutz what did that entire package set you back?
You are taxing my brain a little making me remember.
The building had all the upgrades. Thicker square tube, better sheet metal, vertical roofing with purlins. 10’ X 10’ roll up doors. I priced about 4 different companies and they were all about the same price plus or minus $10. It was crazy how close they all were on price.
Anyway, the building including labor to construct it and delivery.
Concrete slab needed footers to me code in my county.
So concrete slab was maybe $6000 which included large stump removal.
Building was around $8000.
I added a lean-to later and then another slab of concrete to the left later still.
All together I think I have $30-32K in it.
Here’s a link to the shop build story. Shop Build Story
Attachments
F2A2A3FF-8BC8-476A-83DD-44FE2625A22E.jpeg (364.97 KB, 150 downloads)
EF809294-9A4C-4B95-B98A-3BAA7A76812B.jpeg (182.89 KB, 144 downloads)
A57C1B0D-526E-465B-A8D1-18C6C7661891.jpeg (494.63 KB, 141 downloads)
6653FB56-A2F5-4CFF-A61F-621C14185984.jpeg (204.01 KB, 137 downloads)