Okay here is what has been done so far:
1. I had an exta cab shipped from AZ so i could make one good one from two okay ones. Mine had rust issues.
2. Sent instrument cluster to be refurbished by a guy in KY. Looks like brand new. He did a great job.
3. All new brakes; brake lines, brake wheel cylinders, master cylinder, dual chamber hydrovac, all new brake shoes.
4. Removed old split rim widow maker wheels and replaced with Dayton wedge wheels.
5.from cab back frame cleaned and painted.
6. New drive axle, and rear stabilizing shocks.
7. New radiator.
8.basic engine tune up, plugs,wires, points, oil, filters, etc
Engine runs like a top.
I will figure out how to post pictures shortly.