Any utilities need to go in before the concrete is poured? Or, at least, future provisions?
I will run a 2" PVC conduit through the concrete for electrical service. I not doing any plumbing since the shop is only 30 feet from the house. Some might want it, but I'd rather not worry about frozen or broken pipes.
Any electricians care to offer advice on wiring. The wall studs have 5' centers. The gable end studs might be closer than that. I'll need 220V for a compressor, the lift, a welder, possibly certain tools too. I really hate running drop cords all over the place. I'd rather have too many outlets.