I would take a sawzall to the crossmember outlined in the photo link, about 3" inboard of the frame rail on both sides, then fabricate a 2" square tubing cross piece that bolts into the remaining stubs. Put enough drop into the new piece to clear the flywheel and bellhousing, and the job should be good to go with about 3-4 hours' worth of fitting and fabricating.
Jerry