| |
Labor Day Putting down your wrenches or time for MORE wrenching? 
Plenty of places to share. | | Click on image for the lowdown. 
====
| | |
0 members (),
58
guests, and
2
robots. | | Key: Admin,
Global Mod,
Mod | | | Forums66 Topics128,009 Posts1,055,293 Members48,419 | | Most Online14,466 Apr 26th, 2026 | | AD Chevy Trucks Over 6,000 pictures Brad Allen has an awesome collection of Chevrolet factory pictures that he has set up from film strips. Check them out!
Lots of work on Brad's part ... pure enjoyment (and references) for you!
| | THANKS!
For helping keep this great
old truck web site
on the Internet for over 30 years! and not clogged down with Ads! Again, thanks! | | | | Joined: Aug 2005 Posts: 1,186 Shop Shark | | Shop Shark Joined: Aug 2005 Posts: 1,186 | OBSOLETE*: SOLID RIM; SOLID RING-RH; 5 DEGREE
1. Make sure the top bead is unseated and insert the tapered end of the lock ring tool into the notch in the solid side ring. This notch is located between the embossments on the solid side ring.
2. Push the solid side ring downward at a point opposite the notch. Force the lock ring tool handle downward to pry the solid side ring from the rim. Continue prying around the rim until the solid side ring is free.
3. Remove the solid side ring from the rim. Turn the assembly over and unseat the other bead. Remove the rim from the tire.
Picture 1
Picture 2
Picture 3
Bruce
| | |
| |
| |